Let’s talk
Storage/ Pyrovolt GRIDMIND

Energy control

Pyrovolt GRIDMIND

Solar + BESS + EV

EMS controller to coordinate storage, solar energy and charging at a site.

Energy management · EMSSolar / BESS / EV charging
Request informationView specifications ↓

The product in detail.

EMS controller to coordinate storage, solar energy and charging at a site.

01

Communications

4 × RS485 / 2 × CAN / 16 × LAN / 1 × 4G

02

Inputs and outputs

6 × DI / 4 × DO

03

Display

LED + Cloud

04

UPS

≥2 h · Controller

Configuration and applications.

Prepare an enquiry

Your configuration

Choose the options you need. Compatibility and scope will be confirmed in the proposal.

IN DETAIL

Technical specifications.

Control and interface
Communications4 × RS485 / 2 × CAN / 16 × LAN / 1 × 4G
Inputs and outputs6 × DI / 4 × DO
DisplayLED + Cloud
UPS≥2 h · Controller
Installation and options
Power supply220 V AC
Consumption≤100 W
Dimensions (width × depth × height)380 × 165 × 485 mm
Net weight16 kg
ProtectionIP54
Operating temperature−20 to +60 °C

Configuration and scope

What each choice includes.

Options are confirmed in the technical proposal.

FeatureAvailabilityDetails
Power / capacityReference dataSolar + BESS + EV
IntegrationProject-specificUPS runtime applies to the controller, not to backup of site loads.

Installation

Equipment dimensions

Equipment body dimensions. Allow extra space for cables, accessories and maintenance.

Ancho380mm
Fondo165mm
Alto485mm

How it fits your installation.

Coordinated site control

Control requires measurements, communications and compatible equipment. We define managed assets, connections and behaviour if communication with the central system is lost.

Before specifying the equipment.

We review supply, installation space, communications and maintenance access. Selected options and supply scope are defined in the technical proposal.

Pyrovolt Service

Maintenance for your equipment.

Explore our maintenance plans and certified installer programme.

Explore Pyrovolt Service