01
BESS / Energy
Battery container with BMS, thermal management and safety systems. Capacity is selected for the project's usable energy and autonomy.


Containerized BESS
up to 6.26 MWh
Battery container or complete solution with PCS, medium-voltage SKID and EMS.
Document in Spanish · Revision 15.09.2026
We supply battery containers or integrated solutions with PCS, a complete medium-voltage SKID and energy management, sized for each installation.
01
Battery container with BMS, thermal management and safety systems. Capacity is selected for the project's usable energy and autonomy.
02
Bidirectional converters charge and discharge the battery. AC power is sized separately from energy capacity in MWh.
03
Integrated platform with transformer, medium-voltage switchgear, protection, auxiliaries and interconnections according to scope. SF6 Free options.
04
Energy management and plant communications. Interface engineering, testing and commissioning according to the contracted scope.
Prepare an enquiry
Choose the options you need. Compatibility and scope will be confirmed in the proposal.
Firm PPAs with solar plants.
FCR, arbitrage, capacity firming.
Island operation with grid-forming.
Multi-MW peak shaving.
IN DETAIL
| Range capacity | 1,5 – 6,26 MWh |
|---|---|
| Technology | LFP |
| Format | Container, depending on configuration |
| Management | BMS and cooling according to model |
| PCS | Bidirectional conversion; power according to project |
|---|---|
| SKID | Transformer + MV switchgear + protection + auxiliaries |
| Medium voltage | Voltage and power according to connection point; SF6 Free option |
| EMS | Control and plant integration according to architecture |
| Grid functions | Grid-forming and backup require compatible equipment |
| Conformity | Standards, declarations and tests applicable to the configuration |
|---|---|
| European funding | Technical and documentary review according to programme |
| Commissioning | According to contracted scope |
Configuration and scope
Options are confirmed in the technical proposal.
| Feature | Availability | Details |
|---|---|---|
| BESS / Energy | Project-specific | Battery container with BMS, thermal management and safety systems. Capacity is selected for the project's usable energy and autonomy. |
| PCS / Conversion | Project-specific | Bidirectional converters charge and discharge the battery. AC power is sized separately from energy capacity in MWh. |
| SKID / Connection | Project-specific | Integrated platform with transformer, medium-voltage switchgear, protection, auxiliaries and interconnections according to scope. SF6 Free options. |
| EMS / Coordination | Project-specific | Energy management and plant communications. Interface engineering, testing and commissioning according to the contracted scope. |
kWh describes stored energy; kW describes charging or discharging rate. Sizing requires your consumption profile, peaks, solar generation and operating strategy.
We review supply, installation space, communications and maintenance access. Selected options and supply scope are defined in the technical proposal.
BESS + PCS + SKID + EMS
Battery container or complete system, sized for your project.
We can configure supply to meet the technical and documentary requirements of European funding programmes, including FEDER. Programme rules are reviewed before equipment and scope are confirmed.
Equipment definitions, diagrams, declarations of conformity and applicable tests for the selected solution.
Component identification and documented origin. European PCS, SKID and control suppliers can be selected where required or valued by the project.
Documentary support for performance, integration and environmental criteria, including DNSH where applicable, with the developer and their advisers.
Eligibility is checked for each programme and the project as a whole. Equipment supply does not automatically secure a grant.
Reference rules: FEDER storagePyrovolt Service
Explore our maintenance plans and certified installer programme.